BOBO,强行漂亮老师做爰2,小婕子教我做爰-小婕子教我做爰,お母さん爱してるよ歌词翻译,绝美儿媳妇林曼晏

Welcome to Luotian MinTai Stone Col.,Ltd.
  • E-Mail:1013992589@qq.com Hot-Tel:18060329133/18120325888/18371383699
  • 简体中文
  • ENGLISH
  • Stone Knowledge

    Stone processing needs to pay attention to what
      Source       Views 966       Time 2019/12/12 05:27:37

    How to supply high-quality stone for construction projects?, can start from the following six aspects, from the beginning of the selection of materials to the final packaging disposal, are not negligence.

    One, material selection

    Before sealing the stone samples, communicate with the designer according to the requirements of the stone consumption of the project and the action diagram, and deliver the samples corresponding to the requirements.After sealing the sample, according to the end of the customer needs to choose the requirements of the mine to choose the same hole to choose the raw materials, in order to produce.All wastes are numbered in the mine and put into storage.

    Two, raw material cut

    After the waste is expected to plant, there will be waste material inspector to participate in the waste material to make the beginning of the evaluation, according to the pattern, stone classification number storage, and according to the waste material standards to give the cut proposal, as far as possible to improve the utilization rate.

    The sand saw and disk saw workshop will select the appropriate material number of the detailed items according to the opening statement of the material class, and then collect the material according to the number, and then organize the cutting of the material.After cutting the same raw material according to the "raw material number + plate number" pattern to each plate number.After the second inspection by the inspector, make the big board storage list.Such a number check method, can ensure that the stone in the same area to choose the same area and even the same waste material, in the future the same project demand to make up the supply of time can also be based on the large plate number to find color stone near the large plate;

    Three, plate cut

    The control of color and quality in the bridge cutting workshop is primarily reflected in the process of processing, before doing the standard cutting processing, will do a full inspection of the stone to be cut, about the crack line, stone gallbladder some reasonable escape, as far as possible progress rate of finished products;

    4. Protection and disposal

    Imported sikang protective agent is selected for protective treatment, which can be divided into oil and water.Usually for 6 sides 3-5 times more than repeated brushing method.

    Five, typesetting inspection

    All the data board equipment before, will be in the factory "rehearsal".In the natural light, ensure the color uniformity natural;

    Vi. Numbered package

    According to the layout function, the packers will number the qualified products according to the direction of the device through protective disposal and plate inspection, and attach two or more plate diagrams to the outer packing boxes.

    做世红颜短剧在线观看| 海上嫁女记在线观看全集免费播放| 55大马任务攻略| 球探篮球| 无极5r250gt| 我的妻子| 战狼战狼电视剧免费观看完整版| 百武装战记第二季| 女孩自愈视频免费观看第二集| 中国这次为什么不帮巴勒斯坦| 盛夏未来 电影| 男生把小困因放到女生困里视频| steam上的黄油怎么入库| 叫叫识字大冒险| 臣卜扌桑扌圭辶鬲猛| 草原歌曲100首连续播放| 狮子王 电影| 明亡清兴六十年| 小狗视频可爱的小狗视频| 苏勒亚其其格| 《互换人妻HD中字》| 日语slkislkl的意思| 中国最长的朝代| 日剧韩剧在线观看免费全集| 萧县婚庆| 电梯卡如何写入手机nfc| mana本子| 权力游戏| 万脉医疗科技有限公司| 星际开户| 中日德兰足球俱乐部| 米老鼠动画片免费观石| ae转场插件| 葡萄牙足球甲级联赛| 查看contab任名列表| 绝铔观战魂动浸| 國产麻豆AVMDMD0179